MOQ: | 3000 sets |
Price: | $14,000.00 - $17,000.00/sets |
Name:ShangHai Long shou Machinery Co,Ltd |
Parameter configuration of Sany Heavy Industry SY55C excavator
• Specifications
Power Traditional Power
Domestic production by manufacturers
• Bucket backhoe
Tonnage (ton) 5
Working weight of the whole machine (kg) 5780
Bucket capacity (m) ³) 0.1~0.28 (0.21)
Performance
Rotation speed (rpm) 9.6
Walking speed (km/h) 3.73/2.4
• Climbing ability (%) 70% (35 °)
Grounding specific voltage (Kpa) 32.75
• Bucket excavation force (kN) 45
Dipper arm excavation force (kN) 33
Power system
Engine model 4JG1
Rated power (kW/rpm) 36/2100
Maximum torque (N.m) 175/1800
Displacement (L) 3.059
Number of cylinders 4
• Cooling method: water cooling
• Oil capacity
Fuel tank (L) 130
Hydraulic oil tank (L) 85
Engine oil change quantity (L) 9.6
Main body size
Total length of transportation (mm) 5925
Total transportation width (mm) 2005
Total transportation height (mm) 2595
Total length of track (mm) 2545
Track shoe width (mm) 400
Track gauge (mm) 1600
Minimum ground clearance (mm) 330
Rear end turning radius (mm) 1640
Number of supporting wheels (one side) 5
Number of carrier sprockets (one side) 1
Number of track shoes (one side) (pieces) 40
• Scope of work
Maximum excavation radius (mm) 6090
Maximum excavation depth (mm) 3815
Maximum excavation height (mm) 5690
Maximum unloading height (mm) 3930
Maximum vertical excavation depth (mm) 3070
Bulldozer lifting or pushing depth (mm) 385/380
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine
MOQ: | 3000 sets |
Price: | $14,000.00 - $17,000.00/sets |
Name:ShangHai Long shou Machinery Co,Ltd |
Parameter configuration of Sany Heavy Industry SY55C excavator
• Specifications
Power Traditional Power
Domestic production by manufacturers
• Bucket backhoe
Tonnage (ton) 5
Working weight of the whole machine (kg) 5780
Bucket capacity (m) ³) 0.1~0.28 (0.21)
Performance
Rotation speed (rpm) 9.6
Walking speed (km/h) 3.73/2.4
• Climbing ability (%) 70% (35 °)
Grounding specific voltage (Kpa) 32.75
• Bucket excavation force (kN) 45
Dipper arm excavation force (kN) 33
Power system
Engine model 4JG1
Rated power (kW/rpm) 36/2100
Maximum torque (N.m) 175/1800
Displacement (L) 3.059
Number of cylinders 4
• Cooling method: water cooling
• Oil capacity
Fuel tank (L) 130
Hydraulic oil tank (L) 85
Engine oil change quantity (L) 9.6
Main body size
Total length of transportation (mm) 5925
Total transportation width (mm) 2005
Total transportation height (mm) 2595
Total length of track (mm) 2545
Track shoe width (mm) 400
Track gauge (mm) 1600
Minimum ground clearance (mm) 330
Rear end turning radius (mm) 1640
Number of supporting wheels (one side) 5
Number of carrier sprockets (one side) 1
Number of track shoes (one side) (pieces) 40
• Scope of work
Maximum excavation radius (mm) 6090
Maximum excavation depth (mm) 3815
Maximum excavation height (mm) 5690
Maximum unloading height (mm) 3930
Maximum vertical excavation depth (mm) 3070
Bulldozer lifting or pushing depth (mm) 385/380
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine