Price: | $10,000.00 - $15,000.00/sets |
Specifications | |
Power | Traditional Power |
Manufacturer | Import |
Bucket | Backhoe |
Tonnage (tonnage) | 6 |
Work Weight (kg) | 6300 |
Bucket capacity (m³) | 0.28-0.37 |
Arm length (mm) | 3710 |
Bucket rod length (mm) | 1650 |
Origin | Japan |
Performance | |
Walking speed (km/h) | 2.8-4.5 |
Excavation force of bucket (kN) | 54.8 |
Bucket bar excavation force (kN) | 37.3 |
Engine | |
Engine | 4D95LE |
Rated power (kw / rpm) | 40/2100 |
Displacement (L) | 3.26 |
Cylinder diameter * stroke (mm) | 95*115 |
Boom Cylinder-Number *Diameter *Stroke (mm) | 115*840*65 |
Bucket rod cylinder - Number * Diameter * Stroke (mm) | 100*865*60 |
Bucket Cylinder-Number *Diameter *Stroke (mm) | 90*710*60 |
Oil capacity |
|
Fuel tank (L) | 130 |
Hydraulic tank (L) | 90 |
Engine Oil Replacement Quantity (L) | 11 |
Coolant (L) | 10.3 |
Main body size | |
Total length of transport (mm) | 6080 |
Total Transportation Width (mm) | 2225 |
Total Transportation Height (mm) | 2590 |
Cab Height (mm) | 2590 |
Track Grounding Length (mm) | 2130 |
Total Track Length (mm) | 2765 |
Crawler board width (mm) | 450 |
Total Track Width (mm) | 2150 |
Track gauge (mm) | 1700 |
Minimum ground clearance (mm) | 350 |
Back end radius of rotation (mm) | 1750 |
Scope of operation | |
Maximum excavation radius (mm) on shutdown surface | 6220 |
Maximum excavation depth (mm) | 4100
|
Maximum excavation height (mm) | 7150 |
Maximum unloading height (mm) | 5015 |
Maximum vertical excavation depth (mm) | 3505 |
Maximum excavation depth (mm) | 3755 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine
Price: | $10,000.00 - $15,000.00/sets |
Specifications | |
Power | Traditional Power |
Manufacturer | Import |
Bucket | Backhoe |
Tonnage (tonnage) | 6 |
Work Weight (kg) | 6300 |
Bucket capacity (m³) | 0.28-0.37 |
Arm length (mm) | 3710 |
Bucket rod length (mm) | 1650 |
Origin | Japan |
Performance | |
Walking speed (km/h) | 2.8-4.5 |
Excavation force of bucket (kN) | 54.8 |
Bucket bar excavation force (kN) | 37.3 |
Engine | |
Engine | 4D95LE |
Rated power (kw / rpm) | 40/2100 |
Displacement (L) | 3.26 |
Cylinder diameter * stroke (mm) | 95*115 |
Boom Cylinder-Number *Diameter *Stroke (mm) | 115*840*65 |
Bucket rod cylinder - Number * Diameter * Stroke (mm) | 100*865*60 |
Bucket Cylinder-Number *Diameter *Stroke (mm) | 90*710*60 |
Oil capacity |
|
Fuel tank (L) | 130 |
Hydraulic tank (L) | 90 |
Engine Oil Replacement Quantity (L) | 11 |
Coolant (L) | 10.3 |
Main body size | |
Total length of transport (mm) | 6080 |
Total Transportation Width (mm) | 2225 |
Total Transportation Height (mm) | 2590 |
Cab Height (mm) | 2590 |
Track Grounding Length (mm) | 2130 |
Total Track Length (mm) | 2765 |
Crawler board width (mm) | 450 |
Total Track Width (mm) | 2150 |
Track gauge (mm) | 1700 |
Minimum ground clearance (mm) | 350 |
Back end radius of rotation (mm) | 1750 |
Scope of operation | |
Maximum excavation radius (mm) on shutdown surface | 6220 |
Maximum excavation depth (mm) | 4100
|
Maximum excavation height (mm) | 7150 |
Maximum unloading height (mm) | 5015 |
Maximum vertical excavation depth (mm) | 3505 |
Maximum excavation depth (mm) | 3755 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine