Price: | $18,000.00/sets >=1 sets |
Hitachi ZX75US Excavator Parameter Configuration |
specifications |
Working weight of the whole machine (kg) 7100 |
Bucket capacity (m ³) 0.28/0.13/0.33 |
Tonnage (ton) 7 |
Bucket Backhoe |
Power Traditional Power |
Bucket Backhoe |
Manufacturer joint venture/import |
Power Traditional Power |
performance |
Ground specific voltage (Kpa) 30 |
Walking speed (km/h) 5 |
dynamic system |
Engine model Isuzu CC-4JG1 |
Rated power (kW/rpm) 40.3/2100 |
Displacement (L) 3.1 |
Oil capacity |
Fuel tank (L) 120 |
Hydraulic system (L) 90 |
Engine oil change quantity (L) 12 |
Cooling liquid (L) 9.2 |
Main body size |
Total length of transportation (mm) 5870 |
Total transportation width (mm) 2320 |
Total transportation height (mm) 2690 |
Full height of cab (mm) 2690 |
Ground clearance of counterweight (mm) 760 |
Track grounding length (mm) 2290 |
Track shoe width (mm) 450 |
Total width of track (mm) 2320 |
Track gauge (mm) 1870 |
Minimum ground clearance (mm) 360 |
Rear end turning radius (mm) 1210 |
Scope of work |
Maximum excavation radius of the parking surface (mm) 6260 |
Maximum excavation depth (mm) 4110 |
Maximum excavation height (mm) 7210 |
Maximum unloading height (mm) 5210 |
Maximum vertical excavation depth (mm) 3670 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine
Price: | $18,000.00/sets >=1 sets |
Hitachi ZX75US Excavator Parameter Configuration |
specifications |
Working weight of the whole machine (kg) 7100 |
Bucket capacity (m ³) 0.28/0.13/0.33 |
Tonnage (ton) 7 |
Bucket Backhoe |
Power Traditional Power |
Bucket Backhoe |
Manufacturer joint venture/import |
Power Traditional Power |
performance |
Ground specific voltage (Kpa) 30 |
Walking speed (km/h) 5 |
dynamic system |
Engine model Isuzu CC-4JG1 |
Rated power (kW/rpm) 40.3/2100 |
Displacement (L) 3.1 |
Oil capacity |
Fuel tank (L) 120 |
Hydraulic system (L) 90 |
Engine oil change quantity (L) 12 |
Cooling liquid (L) 9.2 |
Main body size |
Total length of transportation (mm) 5870 |
Total transportation width (mm) 2320 |
Total transportation height (mm) 2690 |
Full height of cab (mm) 2690 |
Ground clearance of counterweight (mm) 760 |
Track grounding length (mm) 2290 |
Track shoe width (mm) 450 |
Total width of track (mm) 2320 |
Track gauge (mm) 1870 |
Minimum ground clearance (mm) 360 |
Rear end turning radius (mm) 1210 |
Scope of work |
Maximum excavation radius of the parking surface (mm) 6260 |
Maximum excavation depth (mm) 4110 |
Maximum excavation height (mm) 7210 |
Maximum unloading height (mm) 5210 |
Maximum vertical excavation depth (mm) 3670 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine