MOQ: | 3000 sets |
Price: | $20,000.00 - $28,000.00/sets |
Name:ShangHai Long shou Machinery Co,Ltd |
|
Caterpillar 312D Excavator Parameter Configuration |
specifications |
Working weight of the whole machine (kg) 12920 |
Bucket capacity (m ³) zero point five two |
Boom length (mm) 2800 |
Stick length (mm) 3000 |
Origin Xuzhou |
Tonnage (ton) 12 |
Power Traditional Power |
Bucket Backhoe |
Manufacturer joint venture/import |
Power Traditional Power |
performance |
Rotation speed (rpm) 12.4 |
Walking speed (km/h) 3.4/5.5 |
Climbing ability (%) 70/35 ° |
Bucket excavation force (kN) 96 |
Dipper arm excavation force (kN) 62 |
dynamic system |
Engine model C4.2ACERT |
Rated power (kW/rpm) 72/2200 |
Displacement (L) 4.25 |
Cylinder diameter x stroke (mm) 102 x 130 |
Cooling method: water cooling |
hydraulic system |
Maximum flow rate of main pump (l/min) 127 |
Working hydraulic oil circuit (Mpa) 3.05 |
Hydraulic circuit for walking (Mpa) 3.5 |
Rotary hydraulic circuit (Mpa) 2.3 |
Pilot oil circuit (MPa) 4.12 |
Boom oil cylinder - number x cylinder diameter x stroke (mm) 110 x 1015 |
Dipper rod oil cylinder - number x cylinder diameter x stroke (mm) 120 x 1197 |
Bucket oil cylinder - number x cylinder diameter x stroke (mm) 100 x 939 |
Is the hydraulic crushing pipeline standard? No |
Oil capacity |
Fuel tank (L) 250 |
Hydraulic oil tank (L) 150 |
Hydraulic system (L) 162 (including oil tank) |
Engine oil change quantity (L) 19.5 |
Cooling liquid (L) 17.9 |
Main body size |
Total length of transportation (mm) 7590 |
Total transportation width (mm) 2590 |
Total transportation height (mm) 2970 |
Full height of cab (mm) 2760 |
Ground clearance of counterweight (mm) 915 |
Track grounding length (mm) 2780 |
Total length of track (mm) 3490 |
Track shoe width (mm) 500 |
Total width of track (mm) 2590 |
Track gauge (mm) 1990 |
Minimum ground clearance (mm) 430 |
Scope of work |
Maximum excavation radius of the parking surface (mm) 8430 |
Maximum excavation depth (mm) 5840 |
Maximum excavation height (mm) 8580 |
Maximum unloading height (mm) 6210 |
Maximum vertical excavation depth (mm) 5160 |
Maximum effective excavation depth (mm) 5640 |
Bulldozer width x height (mm) without bulldozer blade |
Bulldozer lifting or pushing depth (mm) without bulldozer |
|
|
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine
MOQ: | 3000 sets |
Price: | $20,000.00 - $28,000.00/sets |
Name:ShangHai Long shou Machinery Co,Ltd |
|
Caterpillar 312D Excavator Parameter Configuration |
specifications |
Working weight of the whole machine (kg) 12920 |
Bucket capacity (m ³) zero point five two |
Boom length (mm) 2800 |
Stick length (mm) 3000 |
Origin Xuzhou |
Tonnage (ton) 12 |
Power Traditional Power |
Bucket Backhoe |
Manufacturer joint venture/import |
Power Traditional Power |
performance |
Rotation speed (rpm) 12.4 |
Walking speed (km/h) 3.4/5.5 |
Climbing ability (%) 70/35 ° |
Bucket excavation force (kN) 96 |
Dipper arm excavation force (kN) 62 |
dynamic system |
Engine model C4.2ACERT |
Rated power (kW/rpm) 72/2200 |
Displacement (L) 4.25 |
Cylinder diameter x stroke (mm) 102 x 130 |
Cooling method: water cooling |
hydraulic system |
Maximum flow rate of main pump (l/min) 127 |
Working hydraulic oil circuit (Mpa) 3.05 |
Hydraulic circuit for walking (Mpa) 3.5 |
Rotary hydraulic circuit (Mpa) 2.3 |
Pilot oil circuit (MPa) 4.12 |
Boom oil cylinder - number x cylinder diameter x stroke (mm) 110 x 1015 |
Dipper rod oil cylinder - number x cylinder diameter x stroke (mm) 120 x 1197 |
Bucket oil cylinder - number x cylinder diameter x stroke (mm) 100 x 939 |
Is the hydraulic crushing pipeline standard? No |
Oil capacity |
Fuel tank (L) 250 |
Hydraulic oil tank (L) 150 |
Hydraulic system (L) 162 (including oil tank) |
Engine oil change quantity (L) 19.5 |
Cooling liquid (L) 17.9 |
Main body size |
Total length of transportation (mm) 7590 |
Total transportation width (mm) 2590 |
Total transportation height (mm) 2970 |
Full height of cab (mm) 2760 |
Ground clearance of counterweight (mm) 915 |
Track grounding length (mm) 2780 |
Total length of track (mm) 3490 |
Track shoe width (mm) 500 |
Total width of track (mm) 2590 |
Track gauge (mm) 1990 |
Minimum ground clearance (mm) 430 |
Scope of work |
Maximum excavation radius of the parking surface (mm) 8430 |
Maximum excavation depth (mm) 5840 |
Maximum excavation height (mm) 8580 |
Maximum unloading height (mm) 6210 |
Maximum vertical excavation depth (mm) 5160 |
Maximum effective excavation depth (mm) 5640 |
Bulldozer width x height (mm) without bulldozer blade |
Bulldozer lifting or pushing depth (mm) without bulldozer |
|
|
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine