MOQ: | 3000 sets |
Price: | $14,000.00 - $17,000.00/sets |
Name:ShangHai Long shou Machinery Co,Ltd |
Parameter configuration of Sany Heavy Industry SY55C excavator |
• Specifications |
Power Traditional Power |
Domestic production by manufacturers |
• Bucket backhoe |
Tonnage (ton) 5 |
Working weight of the whole machine (kg) 5780 |
Bucket capacity (m) ³) 0.1~0.28 (0.21) |
Performance |
Rotation speed (rpm) 9.6 |
Walking speed (km/h) 3.73/2.4 |
• Climbing ability (%) 70% (35 °) |
Grounding specific voltage (Kpa) 32.75 |
• Bucket excavation force (kN) 45 |
Dipper arm excavation force (kN) 33 |
Power system |
Engine model 4JG1 |
Rated power (kW/rpm) 36/2100 |
Maximum torque (N.m) 175/1800 |
Displacement (L) 3.059 |
Number of cylinders 4 |
• Cooling method: water cooling |
• Oil capacity |
Fuel tank (L) 130 |
Hydraulic oil tank (L) 85 |
Engine oil change quantity (L) 9.6 |
Main body size |
Total length of transportation (mm) 5925 |
Total transportation width (mm) 2005 |
Total transportation height (mm) 2595 |
Total length of track (mm) 2545 |
Track shoe width (mm) 400 |
Track gauge (mm) 1600 |
Minimum ground clearance (mm) 330 |
Rear end turning radius (mm) 1640 |
Number of supporting wheels (one side) 5 |
Number of carrier sprockets (one side) 1 |
Number of track shoes (one side) (pieces) 40 |
• Scope of work |
Maximum excavation radius (mm) 6090 |
Maximum excavation depth (mm) 3815 |
Maximum excavation height (mm) 5690 |
Maximum unloading height (mm) 3930 |
Maximum vertical excavation depth (mm) 3070 |
Bulldozer lifting or pushing depth (mm) 385/380 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine
MOQ: | 3000 sets |
Price: | $14,000.00 - $17,000.00/sets |
Name:ShangHai Long shou Machinery Co,Ltd |
Parameter configuration of Sany Heavy Industry SY55C excavator |
• Specifications |
Power Traditional Power |
Domestic production by manufacturers |
• Bucket backhoe |
Tonnage (ton) 5 |
Working weight of the whole machine (kg) 5780 |
Bucket capacity (m) ³) 0.1~0.28 (0.21) |
Performance |
Rotation speed (rpm) 9.6 |
Walking speed (km/h) 3.73/2.4 |
• Climbing ability (%) 70% (35 °) |
Grounding specific voltage (Kpa) 32.75 |
• Bucket excavation force (kN) 45 |
Dipper arm excavation force (kN) 33 |
Power system |
Engine model 4JG1 |
Rated power (kW/rpm) 36/2100 |
Maximum torque (N.m) 175/1800 |
Displacement (L) 3.059 |
Number of cylinders 4 |
• Cooling method: water cooling |
• Oil capacity |
Fuel tank (L) 130 |
Hydraulic oil tank (L) 85 |
Engine oil change quantity (L) 9.6 |
Main body size |
Total length of transportation (mm) 5925 |
Total transportation width (mm) 2005 |
Total transportation height (mm) 2595 |
Total length of track (mm) 2545 |
Track shoe width (mm) 400 |
Track gauge (mm) 1600 |
Minimum ground clearance (mm) 330 |
Rear end turning radius (mm) 1640 |
Number of supporting wheels (one side) 5 |
Number of carrier sprockets (one side) 1 |
Number of track shoes (one side) (pieces) 40 |
• Scope of work |
Maximum excavation radius (mm) 6090 |
Maximum excavation depth (mm) 3815 |
Maximum excavation height (mm) 5690 |
Maximum unloading height (mm) 3930 |
Maximum vertical excavation depth (mm) 3070 |
Bulldozer lifting or pushing depth (mm) 385/380 |
load method
advantage and weekness :best ,keep machine complete and well .u can use when received it ,only waste freight
Method 2 (take boom and bucket out ,put boom on top of machine or other pieces ,same CBM )
Method 3 use 40FR Frame
Method 4 use 40HQ container ,cheapest but destroy machine